Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft

Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft.doc


Dossier / Travail, 2010

18 Pages, Note: A


Extrait


Contents

Case Study Background

Major supply challenges suffered by Boeing
Communication failure
Quality control challenges
Delivery time challenges
Managerial problems
Resources allocation challenge
Labour and technology challenges
Supplier’s Capability Assessment Challenge

Solutions to Supply Chain Problems
Supply Chain Managemen
Supply Chain Strategies
Leadership experience
Proactive supply chain managemen
Customer Relations Managemen

Conclusion

References

Fin de l'extrait de 18 pages

Résumé des informations

Titre
Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft
Sous-titre
Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft.doc
Université
The University of Liverpool
Note
A
Auteur
Année
2010
Pages
18
N° de catalogue
V265533
ISBN (ebook)
9783656553984
ISBN (Livre)
9783656554080
Taille d'un fichier
516 KB
Langue
anglais
Annotations
Well presented and articulated
Mots clés
case, study, boeing, supply, chain, challenges, manufacture, aircraft
Citation du texte
Carol Mueni (Auteur), 2010, Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft, Munich, GRIN Verlag, https://www.grin.com/document/265533

Commentaires

  • Pas encore de commentaires.
Lire l'ebook
Titre: Case Study:  Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft



Télécharger textes

Votre devoir / mémoire:

- Publication en tant qu'eBook et livre
- Honoraires élevés sur les ventes
- Pour vous complètement gratuit - avec ISBN
- Cela dure que 5 minutes
- Chaque œuvre trouve des lecteurs

Devenir un auteur