Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft

Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft.doc


Hausarbeit, 2010

18 Seiten, Note: A


Leseprobe


Contents

Case Study Background

Major supply challenges suffered by Boeing
Communication failure
Quality control challenges
Delivery time challenges
Managerial problems
Resources allocation challenge
Labour and technology challenges
Supplier’s Capability Assessment Challenge

Solutions to Supply Chain Problems
Supply Chain Managemen
Supply Chain Strategies
Leadership experience
Proactive supply chain managemen
Customer Relations Managemen

Conclusion

References

Ende der Leseprobe aus 18 Seiten

Details

Titel
Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft
Untertitel
Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft.doc
Hochschule
The University of Liverpool
Note
A
Autor
Jahr
2010
Seiten
18
Katalognummer
V265533
ISBN (eBook)
9783656553984
ISBN (Buch)
9783656554080
Dateigröße
516 KB
Sprache
Englisch
Anmerkungen
Well presented and articulated
Schlagworte
case, study, boeing, supply, chain, challenges, manufacture, aircraft
Arbeit zitieren
Carol Mueni (Autor:in), 2010, Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft, München, GRIN Verlag, https://www.grin.com/document/265533

Kommentare

  • Noch keine Kommentare.
Blick ins Buch
Titel: Case Study:  Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft



Ihre Arbeit hochladen

Ihre Hausarbeit / Abschlussarbeit:

- Publikation als eBook und Buch
- Hohes Honorar auf die Verkäufe
- Für Sie komplett kostenlos – mit ISBN
- Es dauert nur 5 Minuten
- Jede Arbeit findet Leser

Kostenlos Autor werden