Leseprobe
Contents
Case Study Background
Major supply challenges suffered by Boeing
Communication failure
Quality control challenges
Delivery time challenges
Managerial problems
Resources allocation challenge
Labour and technology challenges
Supplier’s Capability Assessment Challenge
Solutions to Supply Chain Problems
Supply Chain Managemen
Supply Chain Strategies
Leadership experience
Proactive supply chain managemen
Customer Relations Managemen
Conclusion
References
Ende der Leseprobe aus 18 Seiten
- Arbeit zitieren
- Carol Mueni (Autor:in), 2010, Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft, München, GRIN Verlag, https://www.grin.com/document/265533
Kostenlos Autor werden
✕
Leseprobe aus
18
Seiten
Kommentare