Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft

Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft.doc


Trabajo Escrito, 2010

18 Páginas, Calificación: A


Extracto


Contents

Case Study Background

Major supply challenges suffered by Boeing
Communication failure
Quality control challenges
Delivery time challenges
Managerial problems
Resources allocation challenge
Labour and technology challenges
Supplier’s Capability Assessment Challenge

Solutions to Supply Chain Problems
Supply Chain Managemen
Supply Chain Strategies
Leadership experience
Proactive supply chain managemen
Customer Relations Managemen

Conclusion

References

Final del extracto de 18 páginas

Detalles

Título
Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft
Subtítulo
Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft.doc
Universidad
The University of Liverpool
Calificación
A
Autor
Año
2010
Páginas
18
No. de catálogo
V265533
ISBN (Ebook)
9783656553984
ISBN (Libro)
9783656554080
Tamaño de fichero
516 KB
Idioma
Inglés
Notas
Well presented and articulated
Palabras clave
case, study, boeing, supply, chain, challenges, manufacture, aircraft
Citar trabajo
Carol Mueni (Autor), 2010, Case Study: Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft, Múnich, GRIN Verlag, https://www.grin.com/document/265533

Comentarios

  • No hay comentarios todavía.
Leer eBook
Título: Case Study:  Boeing Supply Chain Challenges during the Manufacture of Boeing 787 Aircraft



Cargar textos

Sus trabajos académicos / tesis:

- Publicación como eBook y libro impreso
- Honorarios altos para las ventas
- Totalmente gratuito y con ISBN
- Le llevará solo 5 minutos
- Cada trabajo encuentra lectores

Así es como funciona