1. Summary of a Performance Issue

During ihe summer 1997, I participned in an imporlanl project. We worked the roof construction of “Forum Fribourg1 ”, a multi purpose building. Our team was composed of five employees. We all knew each other well and all had adequate experience with this type of construction.

Tbc 360 parts, each measuring 72.6 feet2 3, have been shaped and glued together in Vial’s factory. Those parts were ready to be delivered to the work site. The project’s architects decided that the roofs framing should be divided between three companies. In fact the roof was also divided in three sections4. The teams were each asked to place 120 parts between the "tridimensional” suspended beams4. Vial SA was covenng the middle section. Jules Sallin SA and Jean Pacquier SA were covering the sides. This was a great chance to sec three companies working together on the same job. Although each group was from the same state and same background, they all performed their work quite differently. One of the differences was how die companies used security tools during the construction of the building. Even though this roof was 65 feet high. Vial SA used the strategy of "the more we assemble on the floor the less we have to do it dangerously up there". One week before the delivery of the parts on the working site, our team built some wood scaffolds on the ground in order to prefab four single parts in one single structure5. This gave us an opportunity to fix the roof working on pie-covered structures greatly reducing the chances of falling. On the other hand the two other teams rose their 120 parts one by one. While working at this height, even the smallest mistake could lead 10 disaster. Our safety tools were the first things we put in the break room. Although the two other teams always performed connected by their ropes, we ignored them.

2. Performance Analysis

The purpose of this analysis is to describe which consequences negatively reinforced our team not using the safety tools even if this was breuking a law. The following part suggests a way for the future to positively reinforce teams to use safety tools appropriately.

It does not matter which construction system the company provides its employees. As soon as a worker performs any tasks at this height, either they should be secured by a rope or by a net6 strongly fixed under the working space. From this notion, at least one example of working with safety can be pinpointed and then analyzed.

The Pinpoint I chose is:

- Using safety ropes while working on structures at great heights

Checklist for evaluating this Pinpoint (Aubrey C. Daniels. 1998):

Abbildung in dieser Leseprobe nicht enthalten

Figures 2 and 3 show why using or not using the safety ropes have been "negatively reinforced" by describing their consequences (Aubrey C. Daniels. 1989).

* Dus system woiks in ookr.rxit tall on the ground In case if fall, the work would suit have great chances lo hll structure pans while falling Actually, the team of the compiny "lutes Sailin’- dal use safety nets instead of safely ropes for a couple of days It took them a lot of time and they fixed the net inappropriately The best way would hase been to let ft*£thc nets by safety Specialists; at this point an imponari proportion of the benefit would have been lost.

Vm

Abbildung in dieser Leseprobe nicht enthalten

- Avoid walking without paying attention to the danger of falling’
- Avoid slowing down the work pace
- Avoid having a limited performing space
- Avoid not being flexible
- Avoid stepping on the rope while moving back and forth
- Avoid mixing clcctnc wires with the rope
- Avoid stepping on and getting mixed up with

Abbildung in dieser Leseprobe nicht enthalten

~ (Figure

shows that using die rope in this setting prevents the construction worker from dying, but it also can severely hinder tob performance.

I can demonstrate through the use of the "Performance Matrix" (Aubrey C.

Daniels. 1989) (see Appendix I) that it is possible to enhance the chances for construction workers lo work in a safe environment. I suggest that the construction managers set

In Inti, most construction workers who use safety topes feel so secure lhai they would walk on the roof without paying mention even though the danger of sliding and hitting against roof structure* while falling down is soil possible safety signs on the working site and remind the their workers before climbing the roof. The construction workers should get regular safely training from professionals in the field. Managers should take time to study each work site and determine the most appropriate safety tool to use. Then some time should be taken in order to set up safety tools. After each job's completion, construction workers will rate how comfortable they were with using those safety tools. At last, the boss should positively reinforce the entire team, if those steps are followed appropriately.

As I thought through the “Performance Matrix" chart. I noticed it would have been possible to use safety tools appropriately during the construction of "Forum

$

Fribourg”. Instead ^having safety ropes at .ached to poles at the same height as the workers and bothering their feet while walking aroundf cables could have been set above the worker's heads letting their safety ropes slide back and forth. The construction workers would have enjoyed their freedom of movements without having the fear to fall down.

This analysis describes the problems causing by inappropriate safety tool usage and suggests to be improved by simply checking through the evaluation of the "Performance Matrix” chart as a method to think before to act for each future constructions sites.

Abbildung in dieser Leseprobe nicht enthalten

1. Documentation

skating area. Vial SA employs about seventy workers. Five workers work at the wood engineering and drawing bureau. Five other employees work at the sawmill. Twenty-five employees migrate between the glue lamiratcd beams industry, traditional carpentry, Gang-Nail® industrial carpentry, and prefab wooden frameworks. The other twenty are all wood construction builders. Every section of those different departments has a "working with" manager. I graduated in 1992 from a wood framing school and have sufficient experience not only in theory but also in practice. I have received the opportunity to work for this company every spring and summer since I started attending Western Michigan University.

1724 Le Mouret/FR Charpentes VIAL SA

Telelon 413 9413 Telefax 413 9410 Email: vial£.fiarpenlg§g^>!yewia.c!l

English

- Industrial produced truss rafters by GangNAIL connector plates,
- Traditional carpentring,
- Glue laminated beams,
- Tridimensional structure,
- Wooden panels and wooden frameworks.
- industrial and agricultural buildings, etc...

Deutsch

- Nagelplattenbinder
- Abbund
- Holzleimbinder
- Gittertraeger
- Holzwaende und Holzfachwerk
- Industrie- und Landwirtschaftgebaeude

Franpais

- Charpentes industrielles assemblees par connectcurs metalliques GangNAIL
- Charpentes traditionnelles
- Lamelle colie
- Structures tridimentionnelles
- Panneaux et ossatures bois
- Batiments industriels et agricoles, etc.

[...]


1 For description of the building type: hup/Avvw.ctscl ch/fnbourg/tOfunMnbourg jrngJi.\h.htm

2 Illustration of separated pans at the bottom of picture 7

3 Illustration of the thxcc different section on picture I and 3

4 Illustration of a blue pole suspending a “tridimcnsionir beam

5 Illustration of 4 pans being put together in one wngic structure on picture 2 and on die bottom of picture 5

Excerpt out of 9 pages

Details

Title
Performance Management
Author
Year
2000
Pages
9
Catalog Number
V97662
ISBN (eBook)
9783638961141
File size
765 KB
Language
English
Notes
Check out: Jugendserver.spinnenwerk.de/~daniel.sciboz. Achtung 7 MB!
Keywords
Performance, Management
Quote paper
Daniel Sciboz (Author), 2000, Performance Management, Munich, GRIN Verlag, https://www.grin.com/document/97662

Comments

  • No comments yet.
Look inside the ebook
Title: Performance Management



Upload papers

Your term paper / thesis:

- Publication as eBook and book
- High royalties for the sales
- Completely free - with ISBN
- It only takes five minutes
- Every paper finds readers

Publish now - it's free