Excerpt
Table of contents
CHAPTER ONE
1.0 BACKGROUND OF STUDY
1.1 STATEMENT OF THE PROBLEM
1.2 AIMS AND OBJECTIVES OF THE STUDY
1.3 RESEARCH QUESTIONS
1.4 RESEARCH HYPOTHESIS
1.5 LIMITATION AND SCOPE OF THE STUDY
1.6 DEFINITION OF OPERATIONAL TERMS
1.7 SIGNIFICANCE OF THE STUDY
CHAPTER TWO
2.1 INTRODUCTION
2.2 CONCEPTS OF DIRECT LABOUR SYSTEM
2.2.1 CHARACTERISTICS OF DIRECT LABOUR SYSTEM
2.2.2 ADVANTAGES OF DIRECT LABOUR SYSTEM`
2.2.3 DISADVANTAGES OF DIRECT LABOUR SYSTEM
2.2.4 ROLES OF CLIENT IN DIRECT LABOUR PROJECT
2.3 CONCEPTS OF CONSTRUCTION PROCUREMENT SYSTEM
2.4 SELECTION CRITERIA OF PROCUREMENT SYSTEM
2.5 EFFECT OF PROCUREMENT SYSTEM ON CONSTRUCTION PERFORMANCE
2.6 PROBLEMS OF DIRECT LABOUR PROJECT
2.6.1 TIME OVERRUN
2.6.2 COST OVERRUN
2.6.3 QUALITY DEFECTS
2.6.4 FACTORS THAT CAUSES TIME AND COST OVERRUN
2.6.5 FACTORS THAT CAUSES QUALITY DEFECT
2.7 PROJECT PLANNING
2.7.1 PROJECT MONITORING
2.7.2 PROJECT EVALUATION
2.7.3 PROJECT COST CONTROL
2.8 PREVIOUS STUDIES
CHAPTER THREE
3.1 INTRODUCTION
3.2 RESEARCH AREA
3.3 POPULATION OF THE STUDY
3.4 SAMPLE SIZE
3.5 SAMPLING TECHNIQUES
3.6 METHOD OF DATA COLLECTION
3.6.1 DEFINATION OF THE QUESTIONNAIRE
3.6.2 CONSTRAINT IN DATA COLLECTION
3.6.3 DATA ANALYSIS
CHAPTER FOUR
4.1 INTRODUCTION
4.2 ANALYSIS AND PRESENTATION OF DESCRIPTIVE DATA
4.3 DATA PRESENTATION, ANALYSIS AND DISCUSSION OF FINDINGS IN RESPECT OF STATED OBJECTIVES
4.4 Summary
CHAPTER FIVE
5.1 INTRODUCTION
5.2 CONCLUSION
5.3 RECOMMENDATION
REFERENCES
- Quote paper
- Blessing Adegoke (Author), 2010, Problems of direct Labour Projects procured in Lagos State, Munich, GRIN Verlag, https://www.grin.com/document/179103
Publish now - it's free
Comments